Cyclone Biparjoy suspends operations at Gujarat ports

Port calls, Mundra
-89%
Days to 90% of the pre-event level
9
Recovered on
2023-06-26
Port calls, MundraPort calls, Mundra, 2023-04-03 (3 April 2023) to 2023-06-26 (26 June 2023): values ranged from 0 calls per day on 2023-06-12 to 16 calls per day on 2023-04-18, with a mean of 9.0 calls per day. The latest value, for 2023-06-26, was 11 calls per day. The shaded band marks the event window, 2023-06-12 to 2023-06-17.051015202023-04-032023-05-152023-06-26
Port calls, Mundra, 2023-04-03 (3 April 2023) to 2023-06-26 (26 June 2023): values ranged from 0 calls per day on 2023-06-12 to 16 calls per day on 2023-04-18, with a mean of 9.0 calls per day. The latest value, for 2023-06-26, was 11 calls per day. The shaded band marks the event window, 2023-06-12 to 2023-06-17.

Source: IMF PortWatch (portwatch.imf.org), International Monetary Fund, using UN Global Platform AIS data. Statistics derived by World Freight Monitor. Terms. Retrieved 2026-11-10 (10 November 2026).

Port calls, Mundra (calls per day).
Datecalls per day
2023-04-034
2023-04-047
2023-04-055
2023-04-068
2023-04-075
2023-04-086
2023-04-095
2023-04-106
2023-04-111
2023-04-125
2023-04-134
2023-04-1410
2023-04-155
2023-04-165
2023-04-179
2023-04-1816
2023-04-196
2023-04-207
2023-04-2112
2023-04-2212
2023-04-238
2023-04-2410
2023-04-2510
2023-04-2611
2023-04-2713
2023-04-2814
2023-04-299
2023-04-3013
2023-05-0114
2023-05-0212
2023-05-038
2023-05-048
2023-05-0511
2023-05-0611
2023-05-0711
2023-05-089
2023-05-0911
2023-05-1010
2023-05-1112
2023-05-129
2023-05-1313
2023-05-147
2023-05-159
2023-05-1610
2023-05-1711
2023-05-1811
2023-05-199
2023-05-2010
2023-05-2112
2023-05-2212
2023-05-2312
2023-05-2416
2023-05-2510
2023-05-269
2023-05-2713
2023-05-2810
2023-05-2913
2023-05-3012
2023-05-3110
2023-06-0112
2023-06-0212
2023-06-038
2023-06-0411
2023-06-0510
2023-06-0612
2023-06-0713
2023-06-0813
2023-06-097
2023-06-1010
2023-06-115
2023-06-120
2023-06-130
2023-06-140
2023-06-150
2023-06-160
2023-06-177
2023-06-189
2023-06-197
2023-06-2010
2023-06-217
2023-06-227
2023-06-2311
2023-06-2413
2023-06-2510
2023-06-2611

This is a measured change in public data during the event window, compared with a baseline before it. It shows timing, not cause. We describe an event as causing a change only when an official source says so. Recovery time is a plain reading against the effect method's own baseline, not a method figure.

Cyclone Biparjoy suspends operations at Gujarat ports on World Freight Monitor. Recovery time for every event.